 CHECK AND TEST RUN

Other instruction CHECK AND TEST RUN

Other instruction

1.Set of the air sending of the fan motor

Before leaving factory, the rotation speed of fan motor has already been set at standard choice. When the indoor unit uses free air sending and not needing to connect with duct, the fan speed of indoor unit is set at standard choice. When the indoor unit needs to connect with duct, please according to the following figure shown to change the connection of the connector installed on the side of electric

box.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Standard air sending

High fan speed air sending

 

 

 

*Before leaving factory*

 

 

 

 

 

 

 

 

 

 

 

 

One side of the control box

One side of the control box

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Connector(White)

 

 

Connector(White)

 

 

 

 

 

 

 

(White)

 

 

 

 

(Red)

 

 

 

 

 

One side

 

 

 

 

One side

 

of

 

 

 

 

 

 

 

of Fan motor

 

Fan motor

 

Unit: Pa

The relative relation between fan speed and static pressure

 

Standard fan speed

 

2. Cut and flaring method

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0

 

Use pipe cutter to cut the pipe, the burrs must be removed.

High fan speed

After inserting the flarer, perform flared nut.

 

 

30

A

Flarer

Flaring dimensions as follows:

Connent pipe

Pipe diameter

Dimension A (mm)

 

 

 

Liquid pipe

6.35mm (1/4î)

 

0.8-1.5

 

 

Gas pipe

12.7mm (1/2î)

 

1.0-0.2

 

 

Correct

 

Incorr

Slant Broken Burrs Uncompleted Too long

3.Configuration of power supply

1.Set of the air sending of the fan motor Air conditioner must use special power supply system (above 20A), and qualified electrician makes wiring and fixing according to wiring regulations specified in national standard.

2. Cut and flaring method In socket, exactly distinguish earth wire with neutral wire and it is wrong to connect them together.

3.Configuration of power supply A leakage breaker must be installed.

4.Installation check and test run Parameters of power supply: H07RN-F 3G 2.0mm2

Manual background Connection method is Y-connection .If the power cord is damaged, it must be replaced by professional people of manufacturer or its maintenance department or similar to avoid dangers.

4.Installation check and test run

Require customers to use air conditioner according to the operation manual. The items checked during test run,please mark Manual background in Manual background

Is the wiring of indoor and outdoor unit secured firmly?

Manual backgroundManual background How about the thermal insulation of the pipe joint:

Manual backgroundManual background Is the electrical wiring between indoor and outdoor unit connected to the terminal block firmly?

Is the display on the control board (LCD) correct?

Manual backgroundManual background Cooling normal?

Does the indoor temperature regulator work normally?

Manual backgroundManual background Is the power supply voltage conformed to the electrical regulation?

No gas leakage on the pipe joint ?

Manual backgroundManual background Is the drainage hose arranged correct?

Manual backgroundManual background Is the earthing wire connected firmly?

Manual backgroundManual background Any noise?

Manual backgroundManual background For the power supply

1shall be connected to the live wire.

2shall be connected to the neutral wire. Manual background Shall be connected to the earth wire.