3. PREPARATION FOR THE INSTALLATION

<Installation example> Installation Procedure

3. PREPARATION FOR THE INSTALLATION

(1) Position of ceiling opening between unit and suspending bolt.

570mm(Indoor unit)

650mm(Ceiling opening)

700mm(Ornament panel)

535mm

 

 

(Distance between suspending bolts)

 

 

570mm(Indoor unit)

 

 

650mm(Ceiling opening)

 

 

700mm(Ornament panel)

 

 

Suspending bracket

Ceiling

 

150mm

320mm

20 Over

 

60mm

 

Ornament panel

 

(2) Cut an opening in ceiling for installation if necessary. (when ceiling already exists.)

Refer to paper pattern for dimension of ceiling hole.

Connect all pipings (refrigerant, water drainage), wirings (inter unit cable) to indoor unit, before installation.

Cut a hole in ceiling, may be a frame should be used to ensure a smooth surface and to prevent vibration. Contact your real estate dealer

(3) Install a suspending bolt. (Use a M10 bolt)

To support the unit weight, anchor bolt shall be used in the case of already exists ceiling. For new ceiling, use built-in type bolt or parts prepared in the field.

Before going on installing adjust space between ceiling.

<Installation example>

50~100Manual background

Manual background Roof

Anchor bolt

Long nut

Suspending bolt

 

 

Note: All the above mentioned parts shall be prepared in field.