Haier HBU-18HF03 Installation Procedure, Item to the checked, Unproper installation may cause

Models: HBU-18CF03 HBU-18HF03

1 25
Download 25 pages 3 Kb
Page 24
Image 24
Item to the checked

Unproper installation may cause Installation Procedure

Check Connect the wires of swing flap motor on the ornament panel.

Manual background Connect the signal wires.

Manual background Check if the remote controlling is avalible, if not,please check if all the connecting of wires is right.Turn off the power for ten seconds,and then try it again.

remote receiver

Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundElectrical box

Emergency switch

Pay special care to the following and check after installation

Item to the checked

Unproper installation may cause

Check

Is indoor unit firmly installed?

Unit might fall down, make vibration or noise.

 

 

 

 

Is gas leakage check performed?

This may lead to gas shortage.

 

 

 

 

Is unit properly insulated?

Dew or water drop may occur.

 

 

 

 

Is water drainage smooth?

Dew or water drop may occur.

 

 

 

 

Is power voltage meet that stipulated on the nameplate?

Problem may occur or parts got burned.

 

 

 

 

Is wiring and piping correctly arranged?

Problem may occur or parts got burned.

 

 

 

 

Is unit safely grounded?

There might be a danger of electric shock.

 

 

 

 

Is wire size correct?

Problem may occur or parts got burned.

 

 

 

 

Are there any obstacles on air inlet and outlet grill of

This may cause poor cooling.

 

indoor and outdoor unit?

 

 

 

 

 

Is record made for piping length and refrigerant

It is hard to control refrigerant charging

 

charging amount?

amount.

 

 

 

 

22

Page 24
Image 24
Haier HBU-18HF03, HBU-18CF03 Installation Procedure, Item to the checked, Unproper installation may cause, Check