Haier HBU-18CF03 Installation Procedure, Level, Polythene pipe, Installation Of Indoor Unit

Models: HBU-18CF03 HBU-18HF03

1 25
Download 25 pages 3 Kb
Page 21
Image 21
4. INSTALLATION OF INDOOR UNIT

Installation Procedure

4. INSTALLATION OF INDOOR UNIT

In the case of new ceiling

(1) Install unit temporarily

In the case of new ceiling Put suspending bracket on the suspending bolt. Be sure to use nut and washer at both ends of the bracket.

(2)< After installation on the ceiling > As for the dimensions of ceiling hole, see paper pattern. Ask your real estate dealer for details.

In the case of ceiling already exists Center of the hole is marked on the paper pattern.

Center of the unit is marked on the card in the unit and on the paper pattern.

Level Mount paper pattern 5 onto unit using 3 screws 6 . Fix the corner of the drain pan at piping outlet.

< After installation on the ceiling >

(3)Adjust unit to its right position. (Refer to preparation for the installation-(1))

(4)Check unit's horizontal level.

Polythene pipe Watert pump and flating switch is installed inside indoor unit, check four corners of the unit for its level using horizontal compartor or PVC tube with water. (If unit is tilting against the direction of water drainage,

problem may occur on floating switch, causing water leakage.)

(5)Remove the washer mounlting 2 , and tighten the nut above.

(6)Remove the paper pattern.

In the case of ceiling already exists

(1)Install unit temporarily

Manual background Put suspending bracket on the suspending bolt. Be sure to use nut and washer at both ends of the bracket. Fix the bracket firmly.

(2)Adjust the height and position of the unit.

(Refer to preparation for the installation (1) ).

(3) Proceed with 3 and 4 of "In the case of new ceiling".

Nut (Prepare in feild)

Washer (Prepared in feild)

Suspending bolts

Fasten (double nuts)

Level

 

Insert

 

Washer fixing pad

 

(prepared in feild)

 

[ secure the washer firmly]

Polythene pipe

 

Screws at the piping outlet is fixed at the corner

of drain pan.

 

Center of ceiling hole Paper pattern

Paper pattern 5

 

Screw

Screw

[Fix the paper pattern]

19

Page 21
Image 21
Haier HBU-18CF03 Installation Procedure, Level, Polythene pipe, Installation Of Indoor Unit, In the case of new ceiling