Haier HWF05XCL Unpacking The Air Conditioner, Preparing The Air Conditioner, Install Top Channel

Models: HWF05XCL

1 64
Download 64 pages 45.81 Kb
Page 12
Image 12
UNPACKING THE AIR CONDITIONER

ENGLISH

UNPACKING THE AIR CONDITIONER

WARNING

EXCESSIVE WEIGHT HAZARD

When moving or lifting the air conditioner, use two or more people. Wear gloves when handling the air conditioner to protect against possible sharp edges and metal fins.

REMOVE PACKAGING MATERIALS

Remove packaging materials. Save the carton and the foam packaging for storing the unit when not in use.

NOTE: There are NO internal packing materials inside the air conditioner to remove―Do Not open the cabinet.

Handle the air conditioner gently.

Keep the air conditioner upright and level. Do not set the air conditioner on its side, front, back or upside down.

The air conditioner must be standing upright for 2 hours prior to installation and operation.

PREPARING THE AIR CONDITIONER

INSTALL TOP CHANNEL

Fig. 7

 

Front

3/8" Screw

Top Channel

(actual size)

 

1. Place the top channel on the top of the air conditioner, lining up the holes in the top channel with the holes in the top of the unit. Make sure the channel is facing forward as indicated by the illustrations.(See Fig.7&8)

2. Using 3/8" self-tapping screws, attach the top channel to the top

of the air conditioner. (See Fig.8)

Fig. 8

Use three (3) 3/8" self-tapping screws for model:

 

HWF05XCL

 

PAGE 10

HOW TO INSTALL

Page 12
Image 12
Haier HWF05XCL Unpacking The Air Conditioner, Preparing The Air Conditioner, Excessive Weight Hazard, Install Top Channel