Install the face doors by hanging them on the hinges. Note: a brass washer goes between the hinges. The finished installation should look like this.

Brass Washer

14

Finish installing chimney cap. Secure flex pipes to cap base using screws, be sure to connect the painted flex pipe for exhaust to the proper side on the base. Now secure base to the chimney using screws, silicone, a combination of the two, or another approved method.

The appliance must be electrically connected and grounded in accordance with local codes or, in the absence of local codes, with the current NFPA 70 National Electric Code or CSA C22.1-Canadian Electrical Code.

“This appliance is equipped with a three prong (grounded) plug for protection against shock hazard and should be plugged directly into a properly grounded three-prong receptacle. DO NOT CUT OR REMOVE THE GROUNDING PRONG FROM THE PLUG.”

Installation Check List

1.Verify unit is assembled for correct gas application. If not, install conversion kit available from Harman Stove Company.

2 Make sure gas line is installed in the fireplace to a point that it can be reached during installation.

3.Install inlet and vent pipes into chimney.

4.Remove glass door by pulling out on the two latches at the bottom of the door. Then lift up and out on the door.

5.Remove flex pipe adapter from the stove body if there is not enough clearance to do the connection as- sembled.

6.Protect hearth with drop cloth or cardboard.

7.Install flue restrictor if needed

8.Connect flex pipes to pipe adapter, and if removed, connect adapter to stove body. Keep marked flex liner to the exhaust side.

9.Reinstall all components that were removed if the pipe adapter was removed from the stove body.

10.Connect Gas line to the unit. Check for leaks using an approved method.

11.Change power cord to opposite side of unit if de- sired.

12.Install log, rock wool and glass door

13.Install Face assembly and adjust to opening.

14.Install chimney cap and mounting adapter

15.Check for leaks, then verify correct operation of stove.