Manuals
/
Hearth and Home Technologies
/
Household Appliance
/
Indoor Fireplace
Hearth and Home Technologies
6000GLX-IPILP-R, 6000GLX-IPILP-S
owner manual
IPI Pilot Flame Patterns
Models:
6000GLX-IPI-R
6000GLX-IPILP-R
6000GLX-IPILP-S
6000GLX-IPI-S
1
15
72
72
Download
72 pages
40.25 Kb
12
13
14
15
16
17
18
19
Troubleshooting
Install
FAQ
Service Parts
Vent Information and Diagrams
Wiring Requirements
Warranty
Maintenance
Appliance Setup
Fixed Glass Assembly
Page 15
Image 15
Figure 3.1 IPI Pilot Flame Patterns
Heat & Glo •
6000GLX-IPI-S/-R,
6000GLX-IPILP-S/-R
•
2101-900
Rev. S • 12/08
15
Page 14
Page 16
Page 15
Image 15
Page 14
Page 16
Contents
Hot glass will cause burns
What to do if you smell gas
Homeowner Reference Information
Congratulations
User Guide
Table of Contents
Reference Materials
Appliance Setup
Troubleshooting
Finishing
CONDITIONS, Exclusions & Limitation of Liability
Limited Lifetime Warranty
Listing and Code Approvals
Requirements for the Commonwealth of Massachusetts
Installation of Carbon Monoxide Detectors
Gas Fireplace Safety
Operating Instructions User Guide
Your Fireplace
Clear Space
Fixed Glass Assembly
Remote Controls, Wall Controls and Wall Switches
Fan Kit optional
Final inspection by
Turn off all electric power to the appliance
On position. The ON/OFF switch may
Lighting Instructions IPI
After Fireplace is Lit
Frequently Asked Questions
Maintenance and Service
Logs
Maintenance Tasks-Qualified Service Technician
Gasket Seal and Glass Assembly Inspection
Venting
IPI Pilot Flame Patterns
Typical Appliance System
Getting Started
Any such action may cause a fire hazard
Design and Installation Considerations
Tools and Supplies Needed
Inspect Appliance and Components
Selecting Appliance Location
Framing and Clearances
Clearances
Constructing the Appliance Chase
Mantel and Wall Projections
Combustible Mantels
Combustible Mantel Legs or Wall Projections
Vent Termination Minimum Clearances
Termination Locations
Covered Alcove Applications
Use of Elbows
Vent Information and Diagrams
Approved Pipe
Vent Table Key
Vent Diagrams Top Vent Horizontal Termination
V1 Minimum H1 Maximum
V1 Minimum H1 + H2 Maximum
Min Max
Top Vent Horizontal Termination Three Elbows
Break Here
Top Vent Vertical Termination
Two Elbows
Maximum + V 2 Min
H1 + H2 V1 + V2 Minimum H1 + H2 Maximum
Top Vent Vertical Termination Three Elbows
Page
Rear Vent Horizontal Termination Two Elbows
H1 Maximum V1 Minimum H1 + H2 Maximum
H1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Max
H1 + H2 Maximum V1 Minimum
Rear Vent Vertical Termination One Elbow
V1 Minimum H1 + H2 + H3
Rear Vent Vertical Termination Three Elbows
Combustible Wall Penetration
Vent Clearances and Framing
Pipe Clearances to Combustibles
Wall Penetration Framing
Pipe DVP SLP
Install the Ceiling Firestop
Vaulted Ceiling Installation
Install Attic Insulation Shield
Installing the Optional Heat-Zone-Gas Kit
Flat Ceiling Installation
Appliance Preparation
Choosing the Top or Rear Vent
Proceed to . C
Rear Vent Securing and Leveling the Appliance
Installing the Non-combustible Board
Assemble Pipe Sections
Installing Vent Pipe DVP and SLP Pipe
Attach Vent to the Firebox Assembly
Assemble Vent Sections DVP Pipe Only
Assemble Slip Sections
Assemble Vent Sections SLP Pipe Only
Disassemble Vent Sections
Secure the Vent Sections
Install Decorative Ceiling Components SLP only
Assemble and Install Storm Collar
Install Metal Roof Flashing
SLP-FS
Install RF4-8
Install Vertical Termination Cap
Install Decorative Wall Components SLP only
Heat Shield Requirements for Horizontal Termination
Install Horizontal Termination Cap DVP and SLP Pipe
Ansi Z223.1 and CAN/CGA-B149 installation codes
Refer to of this manual
Gas Connection
Gas Information
Fuel Conversion
Gas Pressure
Electrical Information
Wiring Requirements
Intellifire Ignition System Wiring
Optional Accessories Requirements
Intellifire Pilot Ignition IPI Wiring Diagram
Electrical Service and Repair
Wall Switch Installation for Fan Optional
Junction Box Installation
Facing Material
Finishing
Finish Door FIT Material See Maximum Thickness
Doors
Appliance Setup
Placement of Embers
Ember Placement
Install the Log Assembly
Log Assembly LOGS-6000GLX LOGS-6000GLXLP
11 Front View
17 Front View
Air Shutter Settings
Install the Mesh
Install Trim and/or Surround
Air Shutter Setting
Troubleshooting
Symptom Possible Cause Corrective Action
Intellifire Ignition System
Ues to spark, and main
Appliance Dimension Diagram
Reference Materials
Location Inches Millimeters
DVP vent components
Vent Components Diagrams
DVP vent components
Horizontal Termination Cap
13-3/4 13-7/8 352 mm 349 mm
787 mm 13-1/4 367 mm 24-5/8 625 mm 27-1/2 127 mm
Roof Flashing Multi-pak 13-3/4 11-7/8 349 mm
302 mm
DVP-TVHW
DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP
251 mm
165 mm
165 mm 222 mm 235 mm 152 mm 168 mm
Elbow
Termination Cap
Snorkel Support Box-Black
Black
Cathedral Ceiling Vertical
Service Parts
Log Set Assembly
Service Parts List
Stocked
At Depot
6000GLX-IPI-R,-S
6000GLX-IPI-R,S
Contact Information
Top
Page
Image
Contents