4Theory of Operation
The Loctite Series 9000 Rotospray Pump is a
Fig. 2 below shows the sequence of operation:
PISTON RETRACTED, CHECK BALL ON SEAT,
METERING CYLINDER FILLED WITH PRODUCT.
PISTON MOVING FORWARD, CHECK BALL
OFF SEAT, PRODUCT DISPENSED.
PISTON MOVING BACK, CHECK BALL ON SEAT
VACUUM FORMED IN METERING CYLINDER.
PISTON FULLY RETRACTED, CHECK BALL ON SEAT,
METERING CYLINDER IS REFILLED WITH PRODUCT.
PUMP READY FOR ANOTHER DISPENSE.
Fig. 2
Rotospray Pump Operating Sequence
6