Henkel 9000 operation manual 3Installation, Inspection Before Installation, Other Controls

Models: 9000

1 17
Download 17 pages 38.77 Kb
Page 5
Image 5
3Installation

Inspection Before InstallationInstallationOther ControlsConnecting Air and Product LinesManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background3Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundInstallationManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background

Inspection Before Installation

The Loctite Rotospray Pump was inspected before shipment. Check the items in the shipping container against the list on Page 3 of this Manual. After removing the items from the shipping container inspect them for visible damage. Promptly report any damaged or missing parts to both the shipper and your Loctite representative.

CAUTION: DO NOT REMOVE ANY ITEMS THAT ARE SEALED IN PLASTIC BAGS UNTIL THEY ARE TO BE USED AS THEY MAY BECOME CONTAMINATED RESULTING IN PERFORMANCE PROBLEMS.

Installation

Locate the pump so that:

1.The pump axis is horizontal.

2.The pump is at least 12 inches (300 mm) below the outlet of the gravity feed reservoir.

3.The pump is at approximately 4 inches (100 mm) below the centerline of the Rotospray centrifugal force dispensing head.

4.There is enough clearance to allow easy access to the outlet fitting.

5.There is enough clearance to allow easy access to the control air fittings.

6.The Rotospray centrifugal force dispensing head is within the range of the outlet tubing.

Install the pump assembly into the Mounting Bracket (Part no. 983335). Secure the Bracket to the mounting surface with suitable fasteners.

See Fig. 4 on page 13 for the bracket mounting hole dimensions and overall pump dimensions.

Other Controls

1.The pump requires a 4-way pneumatic valve to operate. The valve should have a Cv of 0.5 and 1/8 NPT ports.

2.The pneumatic valve shall have both Manual and Automatic modes of operation.

3.A timing device will be required to operate 4-way valve that controls the pump.

Connecting Air and Product Lines

1.Install the air line fittings into the 1/8 NPT ports in the pneumatic actuator.

2.Connect the normally not passing control valve port to the actuator port closest to the adjustment knob, (“Dispense” port on actuator).

3.Connect the normally passing control valve port to the actuator port farthest from the adjustment knob, (“Retract” port on actuator).

4.Connect 3/8-inch OD tubing from the product reservoir to the pump inlet.

5.Connect 1/4-inch OD tubing from the pump outlet to the applicator being used.

4

Page 5
Image 5
Henkel 9000 3Installation, Inspection Before Installation, Other Controls, Connecting Air and Product Lines