Hitachi 3900 Pressure Control, Pump ON/OFF Switch, Removal, Installation

Models: 3900

1 32
Download 32 pages 22.74 Kb
Page 13
Image 13

Pressure Control

Pressure Control

Pump ON/OFF Switch

Removal

WARNING

Read Injection Hazard, page 3; Burn Hazard, page 4

1.FIG. 14. Remove two screws (71) and swing down cover (130a).

2.Disconnect pump ON/OFF switch (130f) connector from control board.

3.Press in on two retaining tabs on each side of pump ON/OFF switch (130f) and remove switch from cover.

Installation

1.Install new pump ON/OFF switch (130f) so tabs of switch snap into place on inside of cover.

2.Connect pump ON/OFF switch connector to control board.

3.Swing up cover (130a) and secure with two screws (71).

'2/5.$  

4//%.').% 

 

#,54#( 

 

A

 

#,54#( 

 

 



 

 

 

 

 

R

 

 

 

 

 

 

 

 

C

 

 

 

 

 



 

 

C

F

B

 

 

 

 

 

 

G

 

 

M

 

 

 

 

 

 

G

 

 

#,54#(

 

 

 

 

A

 

 



'!,,/. #/5.4%2 

 

 

 

 

 

 

 

E D

 

F

 

 

 

 

 

 



 

 

J

 

 

 

 

 H

D



TIA

 

 

 

 

 

 

 



 

 

 

 

 

 

 

 



 

 

FIG. 14

310893L

13

Page 13
Image 13
Hitachi 3900 important safety instructions Pressure Control, Pump ON/OFF Switch, Removal, Installation