Outdoor unit
5.Purging Method:To use vacuum pump
1
Detach the service port's cap of
2
Open the handle at Iow in gaugemanifold, operate
vacuum pump. If the
reach vacuum condition in a moment, check 1 again.
3
Vacuumize for over 15min. And check the level gauge which should read
Check the condition of the scale and hold it for
4
Open the valve rod for the
After 6 seconds, close the
Tube(for R410A)
Open
Close
Open
90O
Gaugemanifold(for R410A)
Anti countercurrent joint
Vacuum pump(for R410A)
5
In case of gas leakage, tighten
If it does not stop gas leakage, discharge whole refrigerants from the service port. After flaring work again and vacuumize,
No gas leakage?
parts of pipe connection. If
leakage stops, then proceed 6 steps.
fill up prescribed refrigerant from the gas cylinder.
6
Detach the charge hose from the service port, open
7
To prevent the gas leakage, turn the service port's cap, the valve rod's cap for
6
6 | |
| |
|
8 | 7 Valve rod cap |
After attaching the each caps, check the gas leakage | 7 Valve rod cap |
| |
around the caps. | 7 Service port cap |
CAUTION:
1.If the refrigerant of the air conditioner leaks, it is necessary to discharge all the refrigerant. Vacuumize first, then charge the liquid refrigerant into air conditioner according to the amount marked on the name plate.
2.Please do not let other cooling medium, except specified one (R410A),
or air enter into the cooling circulation system. Otherwise, there will be
abnormal high pressure in the system to make it crack and lead to
personal injuries.
7