6-3. Correct Installation

Weld Zone

6

50 ft

 

(15 m)

50 ft

 

(15 m)

 

4

5

1

2

7

3

7

Ground All

 

 

Metal Objects

 

 

And All Wiring

 

 

In Welding Zone

 

 

Using #12 AWG

Ground

 

Wire

 

Workpiece

 

 

 

 

If Required

8

Nonmetal

By Codes

 

 

 

Building

 

 

7

7

10

Metal Building 9

Ref. S-0695 / Ref. S-0695

1HF Source (Welder With Built-In HF Or Separate HF Unit)

Ground metal machine case, work output terminal, line disconnect device, input supply, and worktable.

2 Welding Zone And Centerpoint

A circle 50 ft (15 m) from centerpoint between HF source and welding torch in all directions.

3 Weld Output Cables

Keep cables short and close together.

4 Conduit Joint Bonding And Grounding

Electrically join (bond) all conduit sections using copper straps or braided wire. Ground conduit every 50 ft (15 m).

5 Water Pipes And Fixtures

Ground water pipes every 50 ft (15 m).

6 External Power Or Telephone Lines

Locate HF source at least 50 ft (15 m) away from power and phone lines.

7 Grounding Rod

Consult the National Electrical Code for specifications.

8 Metal Building Panel Bonding Methods

Bolt or weld building panels together, install copper straps or braided wire across seams, and ground frame.

9 Windows And Doorways

Cover all windows and doorways with grounded copper screen of not more than 1/4 in (6.4 mm) mesh.

10 Overhead Door Track

Ground the track.