Hobart AM14 ML-32614, AM14C ML-32615 manual Operation, Preparation

Models: AM14 ML-32614 AM14C ML-32615

1 20
Download 20 pages 41.64 Kb
Page 13
Image 13
OPERATION

OPERATION

PREPARATION

Place the pump strainer (when equipped), overflow tube, overflow cover, end cover, slanted strainer, and the strainer bucket in their respective positions, (Fig. 7).

Fig. 7

An automatic detergent dispenser is recommended. Closely follow supplier's instructions. If no automatic dispenser is used, scatter the initial charge of detergent on the slanted strainer. Replenish as needed.

Close the doors which will automatically close the drain. On model AM14: The front inspection door must be closed before the counterbalanced doors can be lowered.

Open the manual steam (globe) valve or gas valve (if applicable). Push the POWER switch ON (Fig. 8). If all machine doors are closed, the fill cycle will begin automatically. During the fill cycle, the word FILL will flash intermittently on the control box readout (Fig. 8). NOTE: If the fill cycle did not begin automatically, make sure that the CYCLE SWITCH (Fig. 8) is on AUTOMATIC and the WASH / RINSE switch (Fig. 8) is OFF.

When the fill cycle has completed, the readout will display the wash temperature. During the rinse cycle, the rinse temperature will be displayed.

Cycle Switch

 

Control Box Readout

 

 

 

Power Switch

Wash/Rinse

Switch

CYCLE SWITCH

 

CONTROL BOX READOUT

 

 

 

PREPARATION POWER SWITCH

WASH / RINSE

SWITCH

PL-40467-1

PL-41177-1

Fig. 8

– 13 –

Page 13
Image 13
Hobart AM14 ML-32614, AM14C ML-32615 manual Operation, Preparation