27
OPERATION
STARTING THE ENGINE
VOLTAGESELECTOR SWITC H
120V
ONLY
120V/
240V
FUELVALVE LEVER
ECO-THROTTLESWITCH
OONN
OOFFFF
OONN
OOFFFF
Make sure theEco-Throttle
switch is in the OFF position, or
more time will be required for
warm-up.
Refer to
SAFE OPERATING PRECAUTIONS
on page and perform the
IS YOUR GENERATOR READY TO GO
checks (see page ).
Turn the fuel valve lever to the
ON position.
IfyouwishtousetheEco-
Throttle system, turn the Eco-
Throttle switch to the ON
position after the engine has
warmed up for 2 or 3 minutes.
Set the Voltage Selector Switch
to match the voltage
requirements for the
application.
Make sure that alla ppliances
connected to the generator are
turned off. The generator may
be hard to start if a load is
connected.
Refer to
AC OPERATION
(see page ) for connecting loads to the
generator.
1.
2.
3.
4.
26 24
33