Mounting the ChargeBase

The ChargeBase should be placed on a dry, stable surface. To easily adapt the ChargeBase to your environment, it can be mounted on a flat, horizontal surface such as a desktop or workbench, or a flat, vertical surface such as a wall.

Location Recommendations

When choosing a location, always bear in mind that

The mounting location must allow users easy access to the power connector.

The ChargeBase should be oriented so that users can easily read the labels.

Installation Hardware

Screw:

3/16 in. dia x 5/8 in. long pan head screw

Washer:

1/2 in. OD x 7/32 in. ID x 3/64 in. thick

Nut:

3/16 in. dia

Bottom Panel

The bottom panel of the ChargeBase offers two mounting options: insert a DIN Rail in the available slot for desk mounting or secure two mounting brackets with the available screw slots.

Rubber Feet

DIN Rail Slot

Screw Slots

Using the DIN Rail

Charging/communication cradles have a slot for a 7.5mm (high) X 35mm (wide) DIN rail on the bottom panel that enables you to mount to a desk or secure, flat surface.

1.Slide the DIN Rail into the DIN Rail slot on the bottom panel.

11 - 6