Honeywell F90B Mounting the F90 Using Threaded Steel Rod, F90A, and washers, applications

Models: F90B F90A

1 24
Download 24 pages 46.61 Kb
Page 9
Image 9
F90A
VENTURI￿ PLATE

F90A,B SELF-CONTAINED COMMERCIAL ELECTRONIC AIR CLEANER

F90A

F90B

 

 

 

 

 

 

29-1/4 (743)

 

 

 

 

 

 

7/8 (22) DIAMETER ￿

 

 

 

24 (610)

4￿

 

 

 

 

 

16 (406)

KNOCKOUT￿

 

 

(102)

 

 

 

 

 

￿

 

 

 

 

 

F90B 19-1/4 (489) Fig. 7. F90 installation dimensions in in. (mm).

Mounting the F90 Using Threaded Steel Rod 14-1/2 (368) Arrange two 2 x 4 supports as shown in Fig. 9.

LATCHES

29-1/4￿

(743)

24￿

(610)16￿

(406)

2 (51)

using the mounting template to locate holes. 9 (229) Mount the steel rods to the supports. 2

1

24￿

(610)

29-1/4 ￿

(743)POWER￿ CORD

3-1/4￿Lift the F90 to the mounting location.

(83)

5-3/4 (146)

7 (178)

1

 

16￿

(406)

3 (76)

and washers. 8￿applications. (203)

2

KEYHOLE

3/8 (10) DIAMETER

3/4 (19)Manual background

Manual background 3/8 (10) DIAMETER

1ALLOW AT LEAST 16 INCHES (406 MILLIMETERS) FROM ￿

FRONT OF F90 TO WALL FOR INSTALLATION AND ￿ REMOVAL OF CELLS.

2ALLOW AT LEAST 9 INCHES (229 MILLIMETERS) FROM ￿ BACK OF F90 TO WALL FOR REMOVAL OF COVER.

M920

Fig. 7. F90 installation dimensions in in. (mm).

 

 

 

 

 

 

 

 

 

 

 

TYPICAL 2 x 8 INCH￿

DRILL 5/16 INCH￿

 

 

 

 

 

 

 

WOOD JOISTS,￿

 

 

 

 

 

 

 

16 INCH CENTERS

(8 mm)￿

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PILOT ￿

 

 

 

 

 

 

 

 

 

 

HOLES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Mounting the F90 Using Threaded Steel Rod

1.

Arrange two 2 x 4 supports as shown in Fig. 9.

2.

Drill four 5/16 inch pilot holes through the supports

 

using the mounting template to locate holes.

3.

Mount the steel rods to the supports.

5/8 INCH (19 mm)￿

DIAMETER KEY HOLES￿ PROVIDED IN AIR￿ CLEANER HOUSING

5-1/2 (140 mm)

Manual background REMOVE￿

CELLS￿

AND￿

FILTERS￿

￿

3/8 x 3 INCH￿

(10 x 76 mm)￿

LAG SCREW AND￿ WASHER

4.

Lift the F90 to the mounting location.

5.

Mount the F90 to the steel rods by attaching the nuts

 

and washers.

M1533

Fig. 8. Mounting the F90 using lag screws in joist

applications.

9

68-0103-6 Revised 11-07

Page 9
Image 9
Honeywell F90B Mounting the F90 Using Threaded Steel Rod, F90A, F90 installation dimensions in in. mm, and washers