Honeywell MicroDock II Confirm Inlet Setup, Activating the Station, Deactivating the Station

Models: MicroDock II

1 19
Download 19 pages 40.66 Kb
Page 10
Image 10
Confirm Inlet Setup

MicroDock II

Quick Reference Guide

The base station pushbuttons are not labelled. The base station

 

Confirm Inlet Setup

 

 

 

is operated by pressing the C pushbutton that is located

 

For initial station activation, ensure the inlets are installed cor-

directly below the option that displays on the LCD.

 

 

rectly.

 

 

Activating the Station

 

 

 

 

• Inlet 1—default connection for ambient air.

1. To activate the station, press and hold C (the left-

 

 

• Inlet 2—default connection for four-gas mix (unless oth-

 

most button) until the following screen displays.

 

 

erwise specified when purchased).

 

 

 

• Inlets 3-5—designed connection for additional gases.

 

 

 

 

However, unless specified at purchase, inlets 3-5 will be

 

 

 

 

configured for ambient air.

 

 

 

 

 

a Warning

 

The normal operation screen then displays.

 

Failed bump tests and calibrations can result if the inlets

 

 

 

are not setup correctly.

 

 

 

To confirm that the inlets are set correctly, complete the follow-

 

 

 

ing:

 

 

 

 

 

1.

Press C menu to access the user options menu.

Deactivating the Station

 

2.

Press C or

to scroll to InletSetup.

To deactivate the station, complete the following:

 

3. Press C sel to access the inlet 1 screen.

1.

Access the normal operation screen (the station can

 

 

 

 

 

only deactivate from the normal operation screen).

 

 

 

 

2.

Press C off.

 

 

 

 

 

 

 

4.

Press the C

to scroll to the inlet 2, 3, 4, and 5

 

 

 

 

screens.

 

 

 

 

 

 

 

8

Page 10
Image 10
Honeywell MicroDock II manual Confirm Inlet Setup, Activating the Station, Deactivating the Station, Quick Reference Guide