MicroDock II

Installation

aWarning

The atmosphere must be free of background gas. Do not use the base station in a hazardous area.

All required National Electrical Codes (NEC) and safety standards must be followed.

Note

The base station can operate from either an electrical power source or batteries. The batteries will provide automatic backup power if the main power fails.

1.Connect the power cord to the POWER port on the base station, and then plug the cord into an AC outlet.

To install the batteries, refer to Battery Installation.

2.Connect the charger cord to the CHARGER port on the base station first, and then plug the cord into an AC outlet.

3.Attach all gas connections. Inlet 1 (PURGE) is config- ured for ambient air and inlets 2-5 are configured for calibration/test gases. Refer to Confirm Inlet Setup.

4.A demand flow regulator must be used with all gas cylinder connections.

5.Ensure the exhaust line is not connected to a nega- tive pressure system.

For AC main installation, a circuit breaker must be integrated in the building installation as a disconnect device for the base station.

The disconnect device must be installed in close proximity to the base station and must be marked as a disconnecting method for the base station.

Battery Installation

To install batteries in the base station, complete the following:

aWarning

Only install batteries in a safe area that is free of hazardous gas. Failure to adhere to this warning can result in personal injury and/or property damage.

Use only BW approved batteries; do not use alkaline or other rechargeable batteries with this charger.

1.Loosen the retaining screws from the battery cover. Do not remove the screws from the cover.

2.Remove the battery cover and insert four C-cell bat- teries into the battery compartment.

3.Replace the battery cover and tighten the retaining screws. Do not overtighten.

Mounting the MicroDock II Base Station and Docking Modules

For wall mounting instructions, refer to the MicroDock II Base Station User Manual.

5

Page 7
Image 7
Honeywell MicroDock II manual Installation