Site Selection

The key objective of a site evaluation or study is to place the HONEYWELL™ Wind Turbine so energy generated from the wind is maximized while meeting the local zoning requirements. Key elements to focused on during the site evaluation include:

1.High average wind speeds. The turbine delivers its best energy performance in areas of high wind speeds. This can best be determined by using simple anemometers at the installation site. It is recommended that such wind speed data is recorded for as long a period as possible and even better if several seasons are considered. When this is not possible, rely on published wind data as an estimate for the average local wind speeds. Published wind atlases can contain very useful

HONEYWELL™ Wind Turbine WT6500 Owner’s Manual - Rev 10

Page 15
Image 15
Honeywell WT6500 owner manual Site Selection, Turbine with Electrical Systems