Honeywell WT6500 owner manual Turbine Wiring Overview, SMARTBOXController

Models: WT6500

1 46
Download 46 pages 4.52 Kb
Page 25
Image 25

Turbine Installation

18

 

 

 

 

Turbine Wiring Overview

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AC IN

 

 

 

L1 N GND

AC INPUT

FROM MAIN SWITCH BOARD SINGLE PHASE 120V 15AMP

 

 

 

 

 

 

 

 

 

(2) #12 THWN-2

+ #6 GND ¾” CONDUIT

 

 

 

 

 

 

 

 

 

 

 

 

L1 N GND

AC OUTPUT TO SUB SWITCH BOARD SINGLE PHASE 120V 15AMP

 

 

 

 

 

 

 

 

 

(2) #12 THWN-2

+ #6 GND ¾” CONDUIT

 

 

 

 

 

 

 

SMARTBOX™Controller

 

 

 

CAT5E or CAT6

 

 

 

 

 

 

 

 

 

 

 

G O R

 

 

 

 

 

 

 

 

 

T

G/W OHR

 

 

 

 

 

 

 

 

TURBINE

 

 

BLU

#4+2-THWN#4(2)GND CONDUIT1” FEET.6DISTANCEMAX

 

 

 

 

 

 

 

HT

BLU/W

 

 

 

 

 

 

 

 

 

 

BRN

 

 

 

 

 

 

 

 

 

HT

BRN/ W

 

 

 

 

 

 

 

 

 

 

 

N GR

 

 

 

 

 

 

 

 

 

HT

 

N/ WGR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12V

12V

 

 

 

 

 

 

 

 

 

 

 

12V

12V

 

 

 

 

 

 

 

 

 

 

 

12V

12V

 

 

 

 

 

 

 

 

 

#6 GND

FEET.

 

 

 

 

 

 

 

 

 

 

 

(2) #10 THWN-2 + ¾” CONDUIT MAX DISTANCE 3

 

 

 

 

 

 

 

 

ORG

 

 

 

 

 

 

 

 

 

 

 

HT

ORG/W

 

 

 

 

 

 

 

 

 

 

 

 

BLU

 

 

 

 

 

 

 

 

 

 

 

HT

BLU/W

 

 

 

 

 

 

 

GND

 

 

 

 

BRN

 

 

 

 

 

 

 

 

 

 

T /W HBRN

 

 

 

 

 

 

 

#4

 

 

 

 

GRN

 

 

 

 

 

 

POLES

EARTH GROUND STAKE

BOXJUNCTIONTURBINE

 

 

 

 

 

 

SIZECONTROLLERTOTURBINESEE

1SHEETONCHART

 

 

 

HT

GRN/W

 

 

 

 

TURBINE

 

 

 

 

 

 

 

 

 

 

 

 

OPTIONAL

drawing pages 36-37.

 

See Appendix for one-line electrical

 

Wiring Overview

 

Figure 2.9

HONEYWELL™ Wind Turbine WT6500 Owner’s Manual - Rev 10

Page 25
Image 25
Honeywell WT6500 owner manual Turbine Wiring Overview, SMARTBOXController