F. Water Supply and Drain Connections

See Fig. 4.

WARNING

1.Water supply and drain connections must be installed in accordance with applicable national, state, and local codes and regulations.

2.Normal operating water temperature should be within 45°F to 90°F (7°C to 32°C). Operation of the icemaker, for extended periods, outside of this normal temperature range may affect icemaker performance.

3.To prevent damage to equipment, do not operate the icemaker when the water supply is off, or if the pressure is below 10 PSIG. Do not run the icemaker until the proper water pressure is reached.

A plumbing permit and services of a licensed plumber may be required in some areas.

External filters, strainers, or softeners may be required depending on water quality. Contact your local Hoshizaki distributor for recommendations.

Water supply pressure should be a minimum of 10 PSIG and a maximum of 113 PSIG. If the pressure exceeds 113 PSIG, the use of a pressure reducing valve is required.

The storage bin drain line and drip tray drain line must be run separately.

Drain lines must have 1/4" fall per foot (2 cm per 1 m) on horizontal runs to get a good flow. A vented tee connection is also required for proper flow.

Drain lines should not be piped directly to the sewer system. An air gap of a minimum of

2 vertical inches (5 cm) should be between the end of the drain pipes from the storage bin and drip tray and the floor drain.

13

Page 13
Image 13
Hoshizaki DCM-300BAH(-OS) instruction manual Water Supply and Drain Connections, See Fig