G. Final Checklist

WARNING

CHOKING HAZARD: Ensure all components, fasteners, and thumbscrews are securely in place after installation. Make sure that none have fallen into the storage bin.

1)Is the icemaker level?

2)Is the icemaker in a site where the ambient temperature is within 45°F to 100°F (7°C to 38°C) and the water temperature within 45°F to 90°F (7°C to 32°C) all year around?

3)Is there at least 6" (15 cm) clearance at rear and sides and 24" (61 cm) at top for proper air circulation and ease of maintenance and service?

4)Have the shipping carton, tape, and packing material been removed from the icemaker?

5)If the icemaker is mounted flat to a counter, has the perimeter where the icemaker contacts the counter been sealed with approved caulk compound? If the icemaker is on a stand, has it been secured to the stand as outlined in the stand's instructions?

6)Have all electrical and water connections been made? Do electrical and water connections meet all national, state, and local code and regulation requirements?

7)Has the power supply voltage been checked or tested against the nameplate rating? Has a proper ground been installed to the icemaker?

8)Are the water supply line shut-off valve and drain valve installed? Has the water supply pressure been checked to ensure a minimum of 10 PSIG and a maximum of 113 PSIG? Note: The icemaker may stop running when the water supply is off, or if the pressure

is below 10 PSIG. When the proper water pressure is reached, the icemaker automatically starts running again.

9)Are the compressor hold-down bolts snug? Have the refrigerant lines been checked

to make sure they do not rub or touch other lines or surfaces? Has the fan blade been checked to make sure it turns freely?

10)Are all components, fasteners, and thumbscrews securely in place?

11)Has the end user been given the instruction manual, and instructed on how to operate the icemaker and the importance of the recommended periodic maintenance?

12)Has the end user been given the name and telephone number of an authorized service agent?

13)Has the warranty card been filled out and forwarded to the factory for warranty registration?

15

Page 15
Image 15
Hoshizaki DCM-300BAH(-OS) instruction manual Final Checklist