7.Final Check List

1)Is the icemaker level?

2)Is the icemaker in a site where the ambient temperature is within +45°F to +100°F and the water temperature within +45°F to +90°F all year around?

3)Is there at least 6" clearance at rear and sides and 24" at top for maintenance or service?

4)Have all shipping carton, tape(s) and packing been removed from the icemaker?

5)Are all components, fasteners and thumbscrews securely in place?

6)Have all electrical and piping connections been made?

7)Has the power supply voltage been checked or tested against the nameplate rating and the correct voltage selected? And has a proper ground been installed in the icemaker?

8)Are the water supply line shut-off valve and drain valve installed? Has the water supply pressure been checked to ensure a minimum of 10 PSIG and a maximum of 113 PSIG?

Note: The icemaker may stop running when the water supply is OFF, or if the pressure is below 10 PSIG. When the proper water pressure is reached, the icemaker automatically starts running again.

9)Have the compressor hold-down bolts and refrigerant lines been checked against vibration and possible failure?

10)Has the bin control switch been checked for correct operation? Move the actuator located on the inside of the bin top panel. The compressor should stop within 90 seconds, and the gear motor within 150 seconds.

11)Has the end user been given the instruction manual, and instructed on how to operate the icemaker and the importance of the recommended periodic maintenance?

12)Has the end user been given the name and telephone number of an authorized service agent?

13)Has the warranty tag been filled out and forwarded to the factory for warranty registration?

14)Have the safety switch brackets moved out of location during shipping? Check on top of the spout and connecting the evaporator to the bin wall.