Hoshizaki KM-900MAF c SEQUENCE 1st Cycle, IMPORTANT Water Valve opening is limited to 6 minutes

Models: KM-900MAF KM-900MRF3 KM-900MWF KM-900MRF

1 65
Download 65 pages 45.09 Kb
Page 19
Image 19
[c]SEQUENCE 1st Cycle

[c]SEQUENCE 1st Cycle

1.Unit energized and Control Switch to “ICE” position. Water supply cycle starts.

2.After 1 minute, Defrost cycle starts.

IMPORTANT Water Valve opening is limited to 6 minutes.&

3.Thermistor reads 48° F. Defrost Timer starts counting.

IMPORTANT Water Valve opening is limited to 6 minutes.

5.After the first 5 minutes in freeze cycle. Ready to complete freeze cycle when Float Switch circuit opens.

IMPORTANT

Board never accepts freeze completion signal within the first 5 minutes in freeze cycle.

4.Defrost Timer stops counting.

Defrost cycle is completed and freeze cycle starts.

IMPORTANT

1.Board never accepts defrost completion signal within the first 2 minutes in defrost cycle.

2.Defrost cycle time is limited to 20 minutes even if Defrost Timer does not stop counting.

19

Page 19
Image 19
Hoshizaki KM-900MAF, KM-900MRF, KM-900MWF c SEQUENCE 1st Cycle, IMPORTANT Water Valve opening is limited to 6 minutes