E. Bin Control Installation

1)Remove the 2 thumbscrews securing insulation panel (B), then remove insulation panel (B). See Fig. 3.

2)Disconnect the discharge hose, the drain valve drain hose, and the overflow drain hose.

3)Disconnect the pump motor connector and the float switch connector from the side of the control box.

4)Remove the tape securing the bin control.

5)Remove the 2 thumbscrews securing the pump motor and float switch assembly. See Fig. 4.

6)Being careful not to pull the bin control lead, lift the bin control up out of the water tank. Being careful not to snag the bin control or bin control lead, slide the water tank, cube guide, and pump motor and float switch assembly out of the icemaker.

Tape Bin Control Lead

Pump Motor

 

Connector

Float Switch

Connector

Thumbscrews

Drain Valve

Drain Hose

Discharge

Bin

Overflow

 

Insulation

 

Panel (B)

Hose

Control

Drain Hose

 

 

Fig. 3

 

 

 

 

 

Thumbscrews

 

 

 

 

Pump Motor

 

 

 

 

and Float

 

 

 

 

Switch

 

 

 

 

Assembly

 

 

Cube Guide

Water Tank

 

Bin Control

 

 

Fig. 4

7)Secure the bin control to the rear interior wall using the 2 thumbscrews on the rear interior wall and either the upper or lower set of mounting holes. For dispenser unit applications, the lower set of holes is recommended. When installed on a standard Hoshizaki storage bin, either set of holes is acceptable. Route the bin control lead vinyl hose through the grommet as illustrated. Do not leave any slack in the ice drop zone. See Fig. 5.

8)Replace the water tank, cube guide, and pump motor and float switch assembly in their correct positions.

9)Secure the pump motor and float switch assembly with the 2 thumbscrews.

10)Reconnect the hoses.

Use Upper or Lower Set of Holes

Fig. 5 Depending on Application

Thumbscrews

 

Bin Control Lead

Rear

 

Interior

Grommet

Wall

 

Bin Control

Vinyl Hose

 