C100_110-160_180.FB 2 Tue Jul 16 06:36:50 1996
Preparing Your Workstation
Before starting the upgrade, use the following procedure to prepare the workstation:
1The workstation must be running
2Determine the workstations LAN ID with the lanscan command by entering the following command:
/usr/sbin/lanscanThe output is similar to the following:
Hardware | Station | Dev | Hardware | NM | Encapsulation Mjr | |||
Path | Address | lu | State | NameUnit State ID | Methods | Num | ||
2.0.2 | 0x08000970ECC0 0 | UP | lan0 | UP | 4 | ETHER | 52 |
After you install the new CPU board or I/O board and power on the system for the first time, you are prompted for the LAN ID. Record the information here so you have a record of it:
EtherLAN ID
You must supply the dash
3Logout of your system and enter a no windows command line session as follows: HP VUE: At the login window, select Options, then select No Windows.
HP CDE: At the login window, select Option, then select
Command Line Login.2