C100_110-160_180.FB 31 Tue Jul 16 06:36:50 1996

Installing the New Main Tray Assembly

15At the prompt, enter the following command to enter the configuration menu:

co

16Configure the console path for the built-in graphics with the following syntax:

mo graphics(0)

17Power off the system.

18Power on the system.

After you install a new CPU board or I/O board and boot the system for the first time, you are prompted for the LAN ID. Enter the LAN ID you recorded in the beginning of this document.

Skip to step 25.

19Power on the monitor, any peripheral devices, and the system unit.

20If a message to press Esc to stop the boot process is displayed, then press Esc. This stops the boot process and brings you to the Boot Console Handler prompt.

21At the prompt, enter the following command to enter the configuration menu:

co

22Configure the console path for your graphics adapter with the following syntax:

mo graphics(n)

where graphics(n) is the graphics path that you recorded earlier.

23Power off the system.

24Power on the system.

After you install a new CPU board or I/O board and boot the system for the first time, you are prompted for the LAN ID. Enter the LAN ID you recorded in the beginning of this document.

25Pack the old main tray in the packaging from the upgrade kit and use the docu- mentation provided to return it to Hewlett-Packard.

31