Husqvarna 966 445001 7UPPER CHUTE INSTALLATION, 8CHUTE / HOOD INSTALLATION, 9LEVELING MOWER DECK

Models: 115 247227 R1 966 445001

1 24
Download 24 pages 55.97 Kb
Page 12
Image 12
ASSEMBLY

 

ASSEMBLY

 

 

7UPPER CHUTE INSTALLATION

8CHUTE / HOOD INSTALLATION

1.Attach bungee latch assembly from kit as illustrated.

1.Push upper chute through the gasketed opening in the cover assembly.

2.Rotate chute so the chute opening is downwards toward the container bags.

Hood Inlet

8063-051

2.Slide upper chute onto lower chute, lining up notches and channels.

3.Stretch bungee latch up onto acorn nut on upper chute to secure.

8063-015

Rotate upper chute to point downwards towards bags

9LEVELING MOWER DECK

Be sure deck is properly leveled for best mower performance. See your mower operator’s manual for instructions.

8063-039

8063-040

12

Page 12
Image 12
Husqvarna 966 445001, 115 247227 R1 7UPPER CHUTE INSTALLATION, 8CHUTE / HOOD INSTALLATION, 9LEVELING MOWER DECK, Assembly