CE: Conversion Instructions
Model 825, 870, and 890 (with V5R2) Processor or Package Feature Conversion Instructions
A)Print LPAR config
B)Power off any secondary partitions and set to hold (don't IPL on system IPL)
C)Instruct customer to make "Available" (LPAR state) all standby processors that have been activated and assigned to partitions
D)Power off the system
For assistance with LPAR, see Information Center articles at: http://publib.boulder.ibm.com/iseries/v5r2/ic2924/info/rzaj9/rzaj9iclpar.htm
Install new Hardware and IPL
1)CE determines if a message (ATTENTION: CUOD CAPACITY CARD
ERROR, XX STANDBY PROCESSORS IN LPAR PARTITIONS) is displayed on the
IPL or Install the System screen and SRC A6004716 is shown on the panel
Enter New System Password
yesno
1
Bypass Mode | WARNING: If The New System Password is |
| not entered, CUoD Screens will |
| not be accessible! |
2
no
no
2
2) CE instructs the customer to check to see |
|
|
if there are new Activation and/or |
|
|
Enablement Codes to be applied. The | yes |
|
CE instructs the customer to use LPAR and | ||
code(s) would be Included in the |
| make available (LPAR state) the number of |
shipment (paper) or posted at website: |
| |
| processors identified in the attention message | |
www.ibm.com/servers/eserver/iseries/ondemand/cod |
| |
|
| |
|
|
|
|
|
|
yes
3)CE determines if the Op Panel or PAL displays a 4730 SRC? If this path is performed within a powered on window
of 48 hours .. SRC 4730
will not be shown, and an IPL will not be required to eliminate the SRC and reestablish the proper machine status
Enter code(s) on the server by using the proper CUoD screen(s)
Wait 5 Minutes for the server to register the new Activation and/or
Enablement Code(s) or the LPAR configuration change
3 | yes | IPL |
| ||
|
| (removes SRC4730) |
no
Enter code(s) on the server by using the proper CUoD screen(s)
A) Set Desired Power on status (hold/system) |
A) Set Desired Power on status (hold/system) | A) Set Desired Power on status (hold/system) |
and then power on any secondary partitions | and then power on any secondary partitions |
B) Instruct the customer to use LPAR to assign | B) Instruct the customer to use LPAR to assign |
processors to target partitions | processors to target partitions |
C) Return required upgrade hardware | C) Return required upgrade hardware |
and then power on any secondary partitions |
B) Instruct the customer to use LPAR to assign |
processors to target partitions |
C) Return required upgrade hardware |
27