CE: Conversion Instructions

Model 825, 870, and 890 (with V5R2) Processor or Package Feature Conversion Instructions

A)Print LPAR config

B)Power off any secondary partitions and set to hold (don't IPL on system IPL)

C)Instruct customer to make "Available" (LPAR state) all standby processors that have been activated and assigned to partitions

D)Power off the system

For assistance with LPAR, see Information Center articles at: http://publib.boulder.ibm.com/iseries/v5r2/ic2924/info/rzaj9/rzaj9iclpar.htm

Install new Hardware and IPL

1)CE determines if a message (ATTENTION: CUOD CAPACITY CARD

ERROR, XX STANDBY PROCESSORS IN LPAR PARTITIONS) is displayed on the

IPL or Install the System screen and SRC A6004716 is shown on the panel

Enter New System Password

yesno

1

Bypass Mode

WARNING: If The New System Password is

 

not entered, CUoD Screens will

 

not be accessible!

2

no

no

2

2) CE instructs the customer to check to see

 

 

if there are new Activation and/or

 

 

Enablement Codes to be applied. The

yes

 

CE instructs the customer to use LPAR and

code(s) would be Included in the

 

make available (LPAR state) the number of

shipment (paper) or posted at website:

 

 

processors identified in the attention message

www.ibm.com/servers/eserver/iseries/ondemand/cod

 

 

 

 

 

 

 

 

 

yes

3)CE determines if the Op Panel or PAL displays a 4730 SRC? If this path is performed within a powered on window

of 48 hours .. SRC 4730

will not be shown, and an IPL will not be required to eliminate the SRC and reestablish the proper machine status

Enter code(s) on the server by using the proper CUoD screen(s)

Wait 5 Minutes for the server to register the new Activation and/or

Enablement Code(s) or the LPAR configuration change

3

yes

IPL

 

 

 

(removes SRC4730)

no

Enter code(s) on the server by using the proper CUoD screen(s)

A) Set Desired Power on status (hold/system)

A) Set Desired Power on status (hold/system)

A) Set Desired Power on status (hold/system)

and then power on any secondary partitions

and then power on any secondary partitions

B) Instruct the customer to use LPAR to assign

B) Instruct the customer to use LPAR to assign

processors to target partitions

processors to target partitions

C) Return required upgrade hardware

C) Return required upgrade hardware

and then power on any secondary partitions

B) Instruct the customer to use LPAR to assign

processors to target partitions

C) Return required upgrade hardware

27

12/15/2003

Page 27
Image 27
IBM 890, 870, 835 manual CE Conversion Instructions, Install new Hardware and IPL