Power Up Selftest

Installation and Set-Up

1.1 Installation

1.1 Installation

Connect the cables to the system box.

5

6

7

K

4

3

2

1

AC

￿

Comm 1, Comm 2,





Comm 3 (Serial printer),

Keyboard,

 









Kensington lock socket,

 

Parallel printer, Monitor

Connect the cables to the monitor.

Check your monitor manual for correct installation.

Push the system box and monitor power switches on. A green light in the switch indicates that power is on.

The terminal takes a few seconds to warm up and complete its power up self-tests. Then, the terminal should display ``Selftest OK.'' If a problem occurs, go to the Appendix A.

1–2Installation and Set-Up

Page 10
Image 10
IBM WS525 manual Installation, Connect the cables to the system box, Connect the cables to the monitor