2. Orient the dry side jet pack (A) as shown and place
it near the three holes in the Inflatable Liner (29). | |
Slide the Temperature Probe Gasket | (46) over the |
connector threads on the Temperature | Probe |
Assembly (30). Insert the wire (not shown) through | |
the small hole in the Inflatable Liner (29) and then |
push the Temperature Probe Assembly into the hole. |
|
Make sure that the threads on the connector are |
|
pushed fully through the vinyl liner. | Firmly tighten |
the Temperature Probe Nut (47) onto the connector |
|
threads. Connect the wire from the Temperature |
|
Probe to the receptacle on the dry side jet pack (A). |
|
3.Move the dry side jet pack (A) against the wall of the tub. Pull the two connectors on the dry side jet pack through the large holes in the Inflatable Liner (29). Slide a Wet Side Gasket (48) onto each connector. Firmly tighten a Wet Side Nut (49) onto each con- nector.
4.Position the wet side jet pack (B) as shown. Place an
the wet side jet pack. | Make sure that the | |
are positioned securely in the grooves, as shown |
| |
in drawing 4A. |
|
|
Attach the threaded collar on the right side (as seen |
| |
in drawing 4A) of the wet side jet pack (B) to the cor- |
| |
responding connector on the dry side jet pack (A). |
| |
Attach the left side in the | same manner. | Important: |
If the threaded collars are not fully tightened, the spa will not function.
Position the Pillow (26) over the hole in the top of the wet side jet pack (B). Push the fasteners on the Pillow through the appropriate holes in the wet side jet pack.
8
2 | 29 | Small | A |
|
|
| |||
|
|
| ||
|
| Hole |
|
|
|
|
| Receptacle |
|
| 46 |
|
|
|
|
| 47 |
|
|
| 30 |
|
|
|
|
| 9 |
|
|
3 |
| 29 |
|
|
|
|
|
| |
|
| Connectors |
| A |
|
|
|
| |
|
| 48 |
|
|
|
| 49 |
|
|
|
| 48 |
|
|
|
|
|
| 9 |
4 |
|
|
|
|
|
| A | ||
|
|
| ||
|
| 26 |
|
|
| B |
|
|
|
| 29 |
|
|
|
4A | View of Inside of Wet Side Jet Pack |
|
| |
|
|
| ||
|
|
|
| |
|
| Threaded Collar |
|
|