STEP 3 (See Diagram 3)

A.) Attach the Right Vertical Beam (#3) onto the Right Base Frame (#1). Secure it with two M10 x 2 ½” Carriage Bolts (#87), Ø ¾” Washers (#94), and M10 Aircraft Nuts (#97).

B.) Attach the Left Vertical Beam (#17) onto the Left Base Frame (#14). Secure it with two M10 x 2 ½” Carriage Bolts (#87), Ø ¾” Washers (#94), and M10 Aircraft Nuts (#97).

C.) Place the Right Upper Frame (#4) onto the Right Vertical Beam (#3). Secure it with two M10 x 2 ½” Carriage Bolts (#87), one 4 3/8” x 1 ¾” Bracket (#32), two Ø ¾” Washers (#94), and two M10 Aircraft Nuts (#97).

D.) Place the Left Upper Frame (#18) onto the Left Vertical Beam (#17). Secure it with two M10 x 2 ½” Carriage Bolts (#87), one 4 3/8” x 1 ¾” Bracket (#32), two Ø ¾” Washers (#94), and two M10 Aircraft Nuts (#97).

E.) Attach the rear of Right Upper Frame (#4) to the Rear Vertical Beam (#9). Attach the rear of Left Upper Frame (#18) to the Rear Vertical Beam from the other side. Align the holes and secure them together with one M10 x 2 ½” Carriage Bolt (#87), Ø ¾” Washer (#94), and M10 Aircraft Nut (#97) to the lower hole. Secure the upper hole with one M10 x 2 3/8” Allen Bolt (#84) and Ø ¾” Washer (#94).

F.) Move the machine to its final location before move on to the next step.

9

Page 10
Image 10
Impex EVE-1500 manual See Diagram