STEP 7 (See Diagram 7 & Cable Loop Diagram)

A.)

Attach the 144” Lower Cable (#59) to the opening on the bottom of the Leg

 

Developer (#9).

B.)

Attach a Pulley (#41) to the opening. Secure it with one M10 x 2 ½” Allen Bolt

 

(#64), two 7/8” Pulley Bushings (#35), and one M10 Aircraft Nut (#81).

C.)

Draw the Cable underneath the Pulley towards the back of the machine through

 

the opening on the bottom of the Main Base Frame (#1) to an open bracket.

D.)

Attach a Pulley to the bracket. Secure it with one M10 x 1 ¾” Allen Bolt (#65),

 

two Ø ¾” Washers (#77), and one M10 Aircraft Nut (#81).

E.)

Draw the Cable underneath the Pulley towards the back of the machine to the

 

Pulley Bracket (#18) underneath the Main Base Frame.

F.)

Attach a Pulley to the bracket. Secure it with one L-shaped Bracket (#23), one

 

M10 x 2” Allen Bolt (#66), two ¾” Washers (#77), and one M10 Aircraft Nut

 

(#81).

G.)

Pull the Cable upward to the Angled Double Floating Pulley Brackets (#15)

 

previously installed in Step 6. Repeat Step D to install another Pulley.

H.)

Draw the Cable around the Pulley then pull downward to the open bracket on the

 

Main Base Frame. Repeat Step D to install another Pulley.

I.)

Draw the Cable around the Pulley then pull upward to the Double Floating Pulley

 

Bracket (#14) previously installed in Step-5. Repeat Step D to install a Pulley.

J.)

Draw the Cable around the Pulley then pull downward to the bracket on the rear

 

of Main Base Frame. Attach the Cable to a 6-Joint Chain (#25) using a C-clip

 

(#28). Secure the other end of the Chain to the bracket with a M10 x 1” Allen

 

Bolt (#72), two ¾” Washers (#77) and one M10 Aircraft Nut (#81).

K.)

Use the length of the Chain to adjust the tension of the Cable Loop System. If

 

the Cables are too loose, shorten the Chain.

L.)

Attach the 15-Joint Chain (#27) to the end of the Cable by using a C-clip. Attach

 

the Arm Curl Handle (#12) to the Chain by using another C-clip. Replace Arm

 

Curl Handle with the Ankle Strap (#82) for various Leg exercises. Adjust the

 

length of Chain to obtain the desired exercise. Remove the Arm Curl Handle and

 

Ankle Strap when using the Leg Developer.

M.)

Lubricate the two Guide Rods with WD-40 or light oil. This will minimize the

 

friction on the Rods so the weight plates can slide up and down on the rods more

 

freely.

15

Page 16
Image 16
Impex MP 1100 manual See Diagram 7 & Cable Loop Diagram