STEP 7 (See Diagram 7 & Cable Loop Diagram)
A.) | Attach the 142” Lower Cable (#28) to the opening on the bottom of the Leg |
| Developer (#10). |
B.) | Attach a Pulley (#38) to the opening. Secure it with one M10 x 2 3/8” Allen Bolt |
| (#64), two ∅ 1” x ½” Pulley Bushings (#39), and one M10 Aircraft Nut (#72). |
C.) | Draw the Cable underneath the Pulley towards the back of the machine to the |
| opening on the bottom of Vertical Frame (#3). |
D.) | Repeat Step B to install a Pulley. |
E.) | Pull the Cable upward to the Angled Double Floating Pulley Brackets (#18) |
| previously installed in |
F.) | Attach a Pulley to the Bracket. Secure it with one M10 x 1 ¾” Allen Bolt (#63), |
| two Ø ¾” Washers (#70), and one M10 Aircraft Nut (#72). |
G.) | Draw the Cable around the Pulley then pull downward to the open bracket on the |
| Main Base Frame (#1). Repeat Step F to install a Pulley. |
H.) | Draw the Cable around the Pulley then pull upward to the Pulley on Double |
| Floating Pulley Bracket (#20) previously installed in |
I.) | Draw the Cable around the Pulley then pull downward to the bracket on the rear |
| of Vertical Frame. Secure the other end of the Chain to the bracket with a M10 x |
| 1” Allen Bolt (#62), two ∅ ¾” Washers (#70) and one M10 Aircraft Nut (#72). |
J.) | Adjust the tension of the Cable System by adjusting the position of the Pulley on |
| the bottom half of the hanging bracket |
| then move the Pulley up one hole on the Double Floating Pulley Bracket. If the |
| cable tension is too tight, move the pulley down one hole on the bracket. |
K.) | Attach the |
| Attach the Arm Curl Handle (#14) to the Chain by using another |
| Arm Curl Handle with the Ankle Strap (#51) or Single Handle (#52) for various |
| exercises. Adjust the length of Chain to obtain the desired exercise. Remove the |
| Arm Curl Handle, Ankle Strap, or Single Handle when using the Leg Developer. |
17