STEP 8 (See Diagram 8 & Cable Loop Diagram)
A.) | Attach a Chain (#51) to the Left Vertical Beam (#4). Secure it with one M10 x 1 3/8” |
| Allen Bolt (#83), two ∅ 3/4” Washers (#93), and one M10 Aircraft Nut (#90). Attach one |
| end of the 136” Butterfly Support Cable (#31) to the Chain using a |
| After complete installing all the cables, check the tightness of the cable loop system. If |
| the cable is too loose, shorten the chain. |
B.) | Draw the Cable to the Angled Double Pulley Bracket (#45) previously installed. |
C.) | Attach a Pulley to the Bracket. Secure it with one M10 x 2” Allen Bolt (#81), two ∅ ¾” |
| Washers (#93), and one M10 Aircraft Nut (#90). |
D.) | Pull the Cable around the Pulley then downward. Repeat Step C above to install a |
| Pulley to a Single Floating Pulley Bracket (#43). Let the Bracket hanging for now. Draw |
| the Cable underneath the Pulley then upward through the Left Upper Frame (#11) to |
| the open Bracket on the top. |
E.) | Attach a |
| Pulley. Draw the Cable over the Pulley then pull the Cable downward to the Selector |
| Rod (#24). Thread the tip bolt of the Cable into the Selector Rod. |
16