Installation Instructions

PRJ-WALLKIT-13

 

 

Wood Studs

1.Using a stud finder and wall plate/bracket assembly, mark four preliminary mounting holes (dual stud) over center of wood studs, or two mounting holes (single stud) in wall plate. (See Figure 3)

2.Drill one 7/32" hole at marked location in wall. (See Figure 3)

3.Install one Grade 2 or better 5/16 x 2-1/2" hex head lag screw (not included) through one Grade 2 or better 5/16" washer (not included), hole in wall bracket and into drilled hole. (See Figure 3)

Steel Studs

IMPORTANT ! : See Site Requirements section before proceeding with Steel Studs installation to ensure installation site meets requirements! The drywall must have a minimum thickness of 1/2"!

1.Using a stud finder and wall plate/bracket assembly, mark four preliminary mounting holes over center of steel studs, or two mounting holes (single stud) in wall plate. (See Figure 4)

2.Drill one 1/2" hole at marked location on wall. (See Figure 4)

3

x 4

(Dual stud)

(G)

 

1

x 4

 

 

 

2

 

 

 

(Single stud)

1

 

 

 

x 2

 

2

 

 

3

x 2

 

Figure 3

4.Level wall bracket using attached bubble level.

5.Make any necessary corrections to remaining mounting hole marking(s).

6.Repeat Steps 2 and 3 for remaining mounting hole(s).

NOTE: Proceed to Installing Short Throw Projector Arm to Bracket section to continue installation.

 

(Dual stud)

 

1

 

x 4

 

2

 

(Single stud)

1

 

 

x 2

2

 

3

x 2

Figure 4

3.Hold metal channel on Toggler® 1/4-20 (BB) Snap-Toggle (not included) flat alongside plastic straps and slide channel through hole. (See Figure 5)

Drywall

 

Plastic Straps

3

 

x 4

 

Figure 5

Visit the InFocus support site at www.infocus.com/support

7

Page 7
Image 7
InFocus PRJ-WALLKIT-13 installation instructions Wood Studs, Steel Studs