Jackson 300XLT, 300XN 300XS SYSTEM FLOW DIAGRAM, Installation/Operation Instructions

Models: 300X 300XN 300XLT 300XS

1 69
Download 69 pages 13.63 Kb
Page 17
Image 17
300XS SYSTEM FLOW DIAGRAM

SECTION 2: INSTALLATION/OPERATION INSTRUCTIONS

300XS SYSTEM FLOW DIAGRAM

All items found within the dotted region are found within the footprint of the machine.

 

 

STEAM

 

 

MANUAL

SOLENOID

 

 

SHUTOFF

VALVE

 

BUILDING

VALVE

S

 

STEAM

 

 

 

SUPPLY

 

 

 

 

 

Y-STRAINER

 

BUILDING

 

 

 

STEAM

 

 

STEAM COILS

RETURN

 

 

 

 

 

BUILDING

 

STEAM

 

 

TRAP

 

WATER

 

 

 

 

 

SUPPLY

 

 

 

 

 

 

PRESSURE

 

 

 

REGULATING

 

 

Y-STRAINER

VALVE

 

 

 

WATER TREATMENT

CARTRIDGE (IF

INSTALLED)

BUILDING

STEAM

SUPPLY

VACUUM

BREAKER

PRESSURE

GAUGE

RINSE

S SOLENOID

VALVE

BUILDING

STEAMEXTERNAL STEAM BOOSTER RETURN

Steam plumbing should be assembled and connected to the steam booster in accordance with the steam booster manufacturer’s instructions and applicable codes.

300X Series Technical Manual 7610-002-64-22

Issued: 07-26-2006 Revised: N/A

12

Page 17
Image 17
Jackson 300XLT, 300XN technical manual 300XS SYSTEM FLOW DIAGRAM, Installation/Operation Instructions