Jacuzzi 2 Wall and 3 Wall manual Secure the rails, Install cover cap on wall post, Step

Models: 2 Wall and 3 Wall

1 32
Download 32 pages 46.98 Kb
Page 23
Image 23
Secure the rails.

3 WALL: TOWER AND CURVED GLASS INSTALLATION

STEP 9

STEP 11

Secure the rails.

Install cover cap on wall post.

COVER CAP

STEP 10

Tighten the tower base bolt. Two shut-off valves are provided. To hook up supply lines, unscrew valves from braided line. Using thread sealant, screw valve to stub outs at bottom of tower. Then reconnect braided line using provided gasket. Do not twist or kink supply lines when connecting.

STEP 12

Install glazing gasket on curved glass wall post on the outside. Note orientation of gasket. Soapy water may help to insert the glazing gasket. On the inside of enclosure, apply sealant the entire length of glass and wall post as well as the entire length of glass and tower.

COLD

SHUT OFF

 

VALVES

 

(PROVIDED)

GLASS

WALL POST

INSIDE OF

ENCLOSURE

HOT

 

BOLT

 

GLAZING GASKET

APPLY SEALANT

 

GLAZING

GASKET

TOWER TOP PLATE

APPLY

SEALANTINSIDE OF

ENCLOSURE

21

Page 23
Image 23
Jacuzzi 2 Wall and 3 Wall Secure the rails, Install cover cap on wall post, Wall Tower And Curved Glass Installation, Step