2 WALL: TOWER, FIXED WALL AND CURVED GLASS INSTALLATION
STEP 13A | STEP 14 |
Insert fixed glass support rail into panel post and tighten | Install cover cap on fixed glass wall post. |
set screw. |
|
| COVER CAP |
STEP 13B
Drill a 1/8" pilot hole into tower support rail using the hole in the glass panel support rail. Screw M3.5X9.5 mm screw into hole.
DRILL 1/8" PILOT HOLE AND
SCREW M3.5X9.5 mm SCREW
INTO HOLE
GLASS PANEL
SUPPORT RAIL
STEP 15
Install glazing gasket on curved glass wall post on the outside. Note orientation of gasket. Soapy water may help to insert the glazing gasket. On the inside of enclosure, apply sealant the entire length of glass and wall post as well as the entire length of glass and tower.
GLASS
WALL POST | INSIDE OF | |
ENCLOSURE | ||
| ||
GLAZING GASKET | APPLY SEALANT | |
|
GLAZING
GASKET
TOWER TOP PLATE
APPLY
SEALANTINSIDE OF ENCLOSURE
11