Jacuzzi 2 Wall and 3 Wall manual Wall Tower, Fixed Wall And Curved Glass Installation, Step

Models: 2 Wall and 3 Wall

1 32
Download 32 pages 46.98 Kb
Page 12
Image 12
Manual background

2 WALL: TOWER, FIXED WALL AND CURVED GLASS INSTALLATION

STEP 9

Place the front rail and tower support rail against the walls. Check level and mark the position for the rail mounting bracket. The screw position will be above the rail. Drill the wall with a 3/16" bit and secure bracket with screws and wall anchors provided.￿

ATTACH RAIL

BRACKET TO WALL

SECURE RAIL TO

BRACKET (TURN CW

TO TIGHTEN)

MOVE COVER CAP

OVER BRACKET

STEP 10

Adjust the rails until tower is vertical in 2 planes.

STEP 11

Secure the rails.

STEP 12

Tighten the tower base bolt. Two shut-off valves are provided. To hook up supply lines, unscrew valves from braided line. Using thread sealant, screw valve to stub outs at bottom of tower. Then reconnect braided line using provided gasket. Do not twist or kink supply lines when connecting.

SHUT OFF VALVES (PROVIDED)

COLD

BOLT

HOT

10

Page 12
Image 12
Jacuzzi 2 Wall and 3 Wall manual Wall Tower, Fixed Wall And Curved Glass Installation, Step