Jacuzzi BZ00000 operating instructions With Air Feature Only, Towers And Doors Installation, Step

Models: BZ00000

1 28
Download 28 pages 54.68 Kb
Page 14
Image 14
STEP 11 (WITH AIR FEATURE ONLY)

TOWERS AND DOORS INSTALLATION

STEP 10

Two shut-off valves are provided per water tower. To hook up supply lines, unscrew valves from braided line. Using thread sealant, screw each valve to stub out at bottom of tower. Then reconnect braided line using provided gasket. Do not twist or kink supply lines when connecting. Perform this step for both water towers.

SHUT OFF VALVES (PROVIDED)

COLD HOT

CAULK AROUND SUPPLY

PIPING AND INSIDE TOWER BASE

STEP 11 (WITH AIR FEATURE ONLY)

Attach air supply pipe to air tower plumbing.

12

Jacuzzi Whirlpool Bath© BZ00000 03/05

Page 14
Image 14
Jacuzzi BZ00000 With Air Feature Only, Towers And Doors Installation, Step, Attach air supply pipe to air tower plumbing