Jacuzzi BZ00000 operating instructions Clean Up After Towers And Door Installation, Step

Models: BZ00000

1 28
Download 28 pages 54.68 Kb
Page 19
Image 19
Seal all around all bases post, and bottom of glass

TOWERS AND DOOR INSTALLATION

STEP 26

Seal all around all bases post, and bottom of glass

of towers with sealant. Also seal the inside of wall posts, jambs, door posts, tile joint to wall side panel on the inside only.

APPLY SEALANT ALONG BASE AND SIDE OF WALL POST AND GLASS AND WALL POST (2 WALL ONLY)

CLEAN UP AFTER TOWERS AND DOOR INSTALLATION APPLY SEALANT ALONG BASE OF FIXED GLASS (2 WALL ONLY)

(2 WALL AND 3 WALL)

APPLY SEALANT ALONG SIDE OF JAMB AND DOOR POSTAND JAMBAND GLASS (BOTH TOWERS)

(2 WALL AND 3 WALL)

APPLY SEALANT ALONG SIDE OF TILE JOINT TO WALL POST

APPLY SEALANT ALL AROUND

(RAIL NOT SHOWN)

TOWER BASES (ALL 3 BASES)

 

STEP 27

Remove tape over drain and any other masking or protective covers. Proceed with clean up.

CLEAN UP AFTER TOWERS AND DOOR INSTALLATION

To avoid dulling and scratching the tower surfaces and support rails never use abrasive cleaners. Use a mild liquid detergent and warm water clean soiled surfaces. Use a mild glass cleaner to clean glass panels and doors.

Paint, tar, or other difficult stains can be removed with normal glass and finish cleaners. Use caution when applying these products to coated metal surfaces. Test in an inconspicuous place before using. Do not use abrasives, alcohol, acetone, ammonia or other solvents on any tower component.

Scratches to towers and metal components may not buff or polish out requiring surface refinishing or replacement. Consult your Jacuzzi Whirlpool Bath© dealer or visit our website at: http://jacuzzi.com/ for a list of authorized finish contractors.

17

Jacuzzi Whirlpool Bath© BZ00000 03/05

Page 19
Image 19
Jacuzzi BZ00000 Clean Up After Towers And Door Installation, Step, Seal all around all bases post, and bottom of glass