Jacuzzi BZ00000 Towers And Doors Installation, Water Tower Detail, With Air Feature Only, Step

Models: BZ00000

1 28
Download 28 pages 54.68 Kb
Page 10
Image 10
TOWERS AND DOORS INSTALLATION

TOWERS AND DOORS INSTALLATION

THESE INSTRUCTIONS ARE FOR SUMMER RAIN II 2 WALL AND 3 WALL UNITS WITH AND WITHOUT AIR FEATURE OPTION.

Refer to COMPONENT IDENTIFICATION on page 4 to help identify parts.

STEP 1

On the 2 wall unit attach the wall jamb to the water tower adjacent to the side wall. Then insert the wall post into the wall jamb. Do not screw jamb and post together at this time. Position each tower on mounting pad on base.

For the water towers, feed hot and cold supply line through appropriate holes in bottom of tower. For air feature, feed air line through large hole on bottom cap of the air tower. Check with a level when attaching towers to base. Tighten tower base bolts after leveling (1 bolt per shower tower and 2 bolts for air tower).

JAMB AND

WALL POST

WATER TOWER DETAIL

FLOW

SWITCH

CABLE*

BOLT (5/16")

WASHER

SHOWER

TOWER (2X)

COLDHOT

* ONLY WITH AIR TOWER UNITS

STEP 2 (WITH AIR FEATURE ONLY)

Route control panel cable up through air tower and connect to control panel.

CONTROL

PANEL CABLE

BOLT 5/16" (2)

WASHER (2)

 

 

 

AIR

AIR SU

PPY

PIPE

TOWER

BLACK LEAD Refer to COMPONENT IDENTIFICATION on page 4 to help identify parts.

REAR OF CONTROLLER

STEP 3 (WITH AIR FEATURE ONLY)

Route flow switch cables up through water towers and connect to flow switch on both shower towers.

FLOW

SWITCH

FROM

CONTROL

BOX

8

Jacuzzi Whirlpool Bath© BZ00000 03/05

Page 10
Image 10
Jacuzzi BZ00000 Towers And Doors Installation, Refer to COMPONENT IDENTIFICATION on page 4 to help identify parts, Step