Jacuzzi EC30000, EC31000, EC33000 manual Installation, Finish Wall Preparation, Ovale Onda, of u

Models: EC33000 EC30000 EC31000

1 16
Download 16 pages 3.5 Kb
Page 10
Image 10
INSTALLATION
Figure 1

INSTALLATION

IMPORTANT: Read all instructions before beginning installation. Consult local codes for requirements.

Each unit arrives ready for installation, completely equipped with plumbing and fittings. Remove the unit from the carton. Retain the shipping carton until satisfactory inspection of the product has been made.

CAUTION: Do not drop the shower tower. Dropping the unit may damage its appearance and function.

Immediately upon receipt, inspect the unit before installing. Should inspection reveal any damage or defect in the finish, do not install. Damage or defect to the finish claimed after the unit is installed is excluded from the warranty. Jacuzzi Whirlpool Bath's responsibility for shipping damage ceases upon delivery of the products in good order to the carrier. Refer any claims for damage to the carrier. For definitions of warranty coverage and limitations, refer

NOTE: Parts with item number listed are included.

Determine the installation height of the shower tower. The height of the top row of the body jets should be level with the users’ shoulders. Place a mark on the wall at the top of the unit when the top jets are at the desired position. Begin installation using the following instructions.

Finish Wall Preparation

1.Drill three holes 1/4" diameter by 1-3/8” deep in the wall at the locations and dimensions shown in Figure 1.

2.Insert plastic anchors (18) into each of the holes, then mount the wall mount fixing rods (7) to the wall using the M4.2x35mm screws (8), see Figure 2. Figure 2

Ovale Onda

- - - - - - - - - - - - - - - - -

A

5-1/8

7-3/16

B

2-3/8

4-1/2

C

33-1/4

46-1/2

D

3-1/2

2-1/4

- - - - - - - - - - - - - - - - -

Measurements in inches

 

nit

p

of u

To

 

 

D

A

 

B

C

NOTE: Figure 3 is for Metallo only.

3.The User can adjust the height. Drill four holes at 1/4" diameter by 1-3/8" deep.

The distance of the holes are 1-3/16" and 35-3/16" apart. Insert the anchor (18) to the holes. Then use the screw (8) to fix the location of the hanger on the wall, see Figure 3.

Figure 3

Finish Wall Preparation 1-3/16"

1-3/16"

35-3/16"

18

8

7

35"

1-3/16"

Jacuzzi Whirlpool Bath: Shower Towers

Page 10

FZ71000C • 10/07

Page 10
Image 10
Jacuzzi EC30000, EC31000, EC33000 manual Installation, Finish Wall Preparation, Ovale Onda, of u