Jacuzzi J-SHOWER TOWERTM manual Disassembly Instructions

Models: J-SHOWER TOWERTM

1 28
Download 28 pages 63.63 Kb
Page 15
Image 15
DISASSEMBLY INSTRUCTIONS

DISASSEMBLY INSTRUCTIONS

Although the J-Shower Tower is shipped partially assembled, it will have to be partially disassembled to install. After removing packing materials, follow the instructions below.

1.Remove end cap on the lower track. (Page 20, illustration 24.)

2.Remove the top ring. (Page 17, illustration 19.)

3.Remove the fixed panel with bottom rail. (Page 16, illustration 15 .)

4.It is not necessary to remove bails or wall bar. Water connections will have to be removed to apply sealant.

HOT WATER

SUPPLY LINE

HOT/COLD

WATER

STUB-OUT

WITH

VALVES

DIVERTER

KNOB SHAFT

COUPLING

COUPLING

COLD WATER

SUPPLY LINE

ILLUSTRATION 10

3.Attach Hot and Cold water supply lines of the mixer/diverter to the stub-out supply lines. (See Illustration 10.)

4.Locate the on/off handle and temporarily place it on the mixer valve. (See Illustration 26.) With the mixer/ diverter valve in the OFF position, turn on the water supply. Check for leaks at all connectors. Turn on the water to the fill spout and check for leaks. Push the diverter knob shaft in and check for leaks at the shower line. Seal any leaks and continue.

13

Page 15
Image 15
Jacuzzi J-SHOWER TOWERTM manual Disassembly Instructions