TOWER INSTALLATION
BACKWALL
BACKWALL
SIDEWALL
5/16" HOLE (3)
TAPE FIRMLY
(TYP)
INNER ORANGE CIRCLE
SIDEWALL
| (5) 3/16" | CUT OUT AS |
EQUAL DISTANCE | REQUIRED | |
AROUND DIAMETER OF | HOLE |
|
BATHTUB |
|
|
ILLUSTRATION 9 (LEFT HAND SHOWN)
1.Locate the drilling template. Place it over the bathtub. The inner orange circle must be centered over the circular opening of the bathtub. (See Illustration 9.) Be sure the orange circle is spaced an equal distance around the bath cavity. The line marked back wall and side wall must be parallel with each wall. Make sure that the template lies flat. Using a sharp center punch, lightly tap through the template hole center location marks onto the bath surface. Remove the template.
2.Drill three (2) 5/16" diameter holes for the tower and (5) 3/16" holes for the bottom rail.
IMPORTANT: THE HOLES MUST BE DRILLED AS ACCURATELY AS POSSIBLE TO INSURE PROPER
INSTALLATION AND OPERATION OF THE SHOWER DOOR.
12