Jacuzzi J-SHOWER TOWERTM manual Tower Installation, ILLUSTRATION 9 LEFT HAND SHOWN

Models: J-SHOWER TOWERTM

1 28
Download 28 pages 63.63 Kb
Page 14
Image 14
TOWER INSTALLATION

TOWER INSTALLATION

BACKWALL

BACKWALL

SIDEWALL

5/16" HOLE (3)

TAPE FIRMLY

(TYP)

INNER ORANGE CIRCLE

SIDEWALL

 

(5) 3/16"

CUT OUT AS

EQUAL DISTANCE

REQUIRED

AROUND DIAMETER OF

HOLE

 

BATHTUB

 

 

ILLUSTRATION 9 (LEFT HAND SHOWN)

1.Locate the drilling template. Place it over the bathtub. The inner orange circle must be centered over the circular opening of the bathtub. (See Illustration 9.) Be sure the orange circle is spaced an equal distance around the bath cavity. The line marked back wall and side wall must be parallel with each wall. Make sure that the template lies flat. Using a sharp center punch, lightly tap through the template hole center location marks onto the bath surface. Remove the template.

2.Drill three (2) 5/16" diameter holes for the tower and (5) 3/16" holes for the bottom rail.

IMPORTANT: THE HOLES MUST BE DRILLED AS ACCURATELY AS POSSIBLE TO INSURE PROPER

INSTALLATION AND OPERATION OF THE SHOWER DOOR.

12

Page 14
Image 14
Jacuzzi J-SHOWER TOWERTM Tower Installation, ILLUSTRATION 9 LEFT HAND SHOWN, Installation And Operation Of The Shower Door