Jacuzzi J-SHOWER TOWERTM manual Outsid E, Illustration, Washer, Screws

Models: J-SHOWER TOWERTM

1 28
Download 28 pages 63.63 Kb
Page 20
Image 20
OUTSID

DRILLING TOP RING

OUTSID

E

15° SCREWS

IMPORTANT:

MUST DRILL AT A 15°

1/8"ANGLE TO AVOID Manual backgroundDRILLING THROUGH ROLLER TRACK OF TOP RING.

11.Drill a 3/32" diameter hole into the top ring at about 15° . (See Illustration 20.) Engage the top of the fixed panel with the top ring groove. Secure the top of the fixed panel to the top ring. (See Illustration 21.)

ILLUSTRATION 20

DRILLING TOP RING

ROLLER

FIXED

TRACK

PANEL

TOP

 

RING

 

GROOVE

 

15°

H9

IMPORTANT:

MUST DRILL AT 15°

 

ANGLE TO AVOID

 

DRILLING THROUGH

 

ROLLER TRACK.

 

ILLUSTRATION 21

RING TO BRACKET

Manual backgroundManual background SCREW (2) H9

Manual background WASHER (2) H5

FLAT PORTION

OF TOP RING

DRILL TWO (2) 3/32"

DIAMETER HOLES

ILLUSTRATION 22

H9

SCREW

M3.5X9.5MM

QTY.-1

STAINLESS STEEL

 

12.Plumb and square the tower. Mark a point through each slot of the wall bracket. Drill two (2) 3/32" diameter holes in the top ring through the slots of the bracket. (See Illustrations 22.) Secure the top ring to the wall bracket.

LOCATED IN HARDWARE KIT

H5

WASHER

FLAT WASHER

#8 TYPE B

 

QTY.-2

STAINLESS STEEL

H9

SCREWS

M3.5X9.5MM

STAINLESS STEEL

 

QTY.-2

 

18

Page 20
Image 20
Jacuzzi J-SHOWER TOWERTM manual Outsid E, Illustration, Washer, Screws