Jacuzzi J-SHOWER TOWERTM manual Screw, Illustration Located In Hardware Kit, H9 SCREW

Models: J-SHOWER TOWERTM

1 28
Download 28 pages 63.63 Kb
Page 17
Image 17
ILLUSTRATION 13

FIXED PANEL TO BOTTOM RAIL

LOCATED IN HARDWARE KIT

FIXED PANEL

TWO

SCREWS

H8

 

LAY A 1/4" BEAD OF

BOTTOM RAIL

SEALANT UNDER THE

FIXED PANEL

 

H8

SCREW

M4.2X19MM

STAINLESS STEEL

 

QTY.-2

 

 

DRILLING FIXED PANEL

IMPORTANT:

MUST DRILL AT 15°

ANGLE TO AVOID

1/8"

DRILLING THROUGH SIDE OF RAIL.

15° Manual background

ILLUSTRATION 12

DRILLING FIXED PANEL

IMPORTANT:

MUST DRILL AT 15°

ANGLE TO AVOID

DRILLING THROUGH

DOOR GUIDE AREA.

H9

15° Manual background

DOOR GUIDE

AREA

ILLUSTRATION 14

ILLUSTRATION 13

LOCATED IN HARDWARE KIT

H9 SCREW

M3.5X9.5MM

STAINLESS STEEL

QTY.-1

 

7.Locate the bottom rail and the fixed panel. Lay a bead of sealant on the bottom of the fixed panel. Secure the

bottom rail to the fixed panel. (See Illustration 12.) Drill a 3/32" diameter hole into the bottom rail at about 15° . Drill only through the first aluminum thickness. (See Illustration 13.) Secure the front of the fixed panel to the bottom rail. (See Illustration 14.) Clean off excess sealant.

15

Page 17
Image 17
Jacuzzi J-SHOWER TOWERTM manual Screw, Illustration Located In Hardware Kit, H9 SCREW