Jacuzzi SEDONA manual Framing and Support, Framing and ROUGH-IN Details

Models: SEDONA

1 20
Download 20 pages 50.88 Kb
Page 5
Image 5

Framing and Support

The drain extends below the bottom of the base. Note that this requires a cutout in the floor.

The floor structure beneath the base must be able to support a total weight of base, and bather. The unit must be supported from the bottom of the base and not from the tile flange. If the subfloor is level, no other preparation is necessary. You can proceed to install the base. If the subfloor is not level, you MUST level the entire surface prior to installing the base. The use of materials that shim or provide a level installation are allowed provided the method used will ensure a level base that is supported from the bottom. Materials that may be used are a floor leveling compound, mortar, plaster or minimal expansion structural foam having a minimum density of 5 lbs/cubic ft.; however the base must remain level in order for it to drain properly and the foam feet must make full contact with the leveling material. Both sides of a joint or splice of subfloor should be level to each other. When attaching the base flanges to stud wall, use shims to fill any gaps between the tile flange and studs.

The shower base should be installed after construction of the studwall and after rough plumbing is in place using the self drilling screws provided with your unit.

It is important that the framed pocket be plumb and square and that the framing members be located as detailed in the framing illustration.

The protective film liner inside the base is used to prevent damage to the finish from shoes, tools, etc. during installation. Before installation, remove liner to inspect for any defects, reapply and do not remove until final cleanup.

FRAMING AND ROUGH-IN DETAILS

(FOR LEFT HAND UNIT)

HEIGHT OF UNIT WITH

JACUZZI WHIRLPOOL BATH

STEAM ENCLOSURE: 83-3/8" ±1/4".

WITH DOME ADD 2" ±1/4"

 

 

90º

 

 

17-7/8"

 

 

15-3/8"

 

 

 

 

 

10-1/2" x 5"

33-1/4"

 

DRAIN CUT-OUT

 

FRONT

OF

 

SUB-FLOOR

 

 

 

DOUBLE

 

 

60-1/4"

 

STUDS

90º

 

 

 

 

 

 

 

AREA FOR DRAIN OF STEAM

GENERATOR WITH MANUAL OR

OPTIONAL AUTOMATIC VALVE.

EXACT LOCATION TO BE

DETERMINED BY INSTALLER

MINIMUM 6"

FROM FINISHED CEILING

OR BOTTOM OF OPTIONAL DOME

TO

TEMPERATURE

SENSOR

LOCATION

MAXIMUM 7'

FROM FLOOR

TO DIGITAL

CONTROLLER

LOCATION

FROM STEAM

GENERATOR

3