Unpacking the Project EVEREST DD66000 System
All components of the Project EVEREST system have been very carefully packed for maximum protection against damage.
As with any superior audio product, it is advisable to keep the original packing materials in case it is necessary to transport the Project EVEREST system.
Because of the bulk and weight of this loudspeaker, at least two people are required to unpack it in the following manner.
Stainless steel round feet are installed onto the bottom of the speaker cabinet. In order to avoid damages to the floor, we strongly advise to unpack on a well protected surface such as a thick carpet or cardboard. (Loudspeaker system is wrapped with
I.Cut the straps, which tie the carton, by scissors or a knife. (Please be careful that the cut strap springs up and hit your face or hand.)
II.Slowly lift up the top cover and remove it. If there is not enough room above the box to pull out the top cover, cut side and top of it by a knife
(drawing
I | II |
III.Remove cardboard and packing materials. Please do not forget to take out accessories from the upper endpads.
IV. | Remove upper endpads. |
V.Slide down the loudspeaker system from the bottom board together with bottom cardboard.
III | IV | V |